Bruker Nonius Pre-installation checklist

Pre- Installation checklist for FR591, FR590, KappaCCD(2000) or MACH3

This checklist must be filled in and sent to Bruker Nonius when all is ready for installation (after receiving of the equipment). Bruker Nonius will not schedule installation before reception of the list. It will be e-mailed to service@nonius.nl in the Netherlands. For explanation see the pre-installation requirements.

Customer institute :
Customer city :
Customer contact person :
Email address :
Address of installation :
Laboratory phone : 

Laboratory fax :

Equipment to be installed :
Nonius order number :
Air conditioning present :
Yes No
Power mains socket and plug for FR590/FR591 present :
For fixed connection, wall isolator present :
Yes 

Yes

Power mains extension cable with plugs (min. 2) for KappaCCD or MACH3 present :
Yes
Cooling water connection and plugs, water hoses and clamps present (not for Microsource): Yes
If an external interlock is needed, describe which switch (connection) is supplied :
Network :
Type of connector : RJ45 
BNC (coax)
Host computer (KappaCCD(2000), MACH3) IP address
Host name
domain name
Server computer (KappaCCD(2000)) IP address
Host name
Shipment : have all the crates arrived and with no physical damage : Yes No (inform Nonius)
Cooling liquid present (only for KappaCCD) : Yes No
Is there 25 litres of demineralized water (not distilled water) present (only for FR591 or Microsource) : Yes
Is there installation assistance available including pallet jacks and dollies for the Bruker Nonius engineer to move the equipment into position ? Yes
Standard drilling machine available : Yes
All preparations for installation ready : Yes
Date :
Other comment :
Now: to send in the form, orto clear the form.